High-Rise Building Surveying
Geodetic surveying for a 144-metre high-rise development, supporting precision control, structural positioning, verification measurements, and construction surveying throughout the development of the 37-storey structure.


Commercial Complex Surveying
Precision geodetic surveying for a major commercial development with approximately 160,000 m² of built-up area. Surveying works supported structural positioning, control networks, elevation and alignment verification, and construction geometry across the multi-level complex and underground areas.
Underground Metro Tunnelling & Station Surveying
Precision geodetic surveying for a major underground metro project comprising two drill-and-blast running tunnels, a service/access tunnel, and an underground metro station. Surveying works included underground control networks, tunnel alignment and excavation guidance, setting out, profile and geometry verification, monitoring, and as-built documentation throughout the construction works.


Design,Build and Calculate Geodetic Network in plan and height.

TBM Tunnel Surveying
Precision geodetic surveying for a 33 km TBM-driven tunnel, including underground control networks, TBM positioning and alignment, guidance control, and as-built verification. The works incorporated the VMT TUnIS navigation system to support continuous TBM position control and accurate excavation along the designed tunnel alignment.


Infrastructure Structure Monitoring.

